Tools

Position size

Risk budget divided by stop risk per contract, rounded down.

Risk budget
$125.00
Risk per contract
$40.00
Contracts
3
Dollar risk at 3 contracts
$120.00

MNQ: tick 0.25 index pt = $0.50; 1 point = $2.00. Excludes commissions, fees, and slippage.

Formula

Contracts = floor((account x risk %) / (stop x value per unit)). Value per unit is the tick value for a stop in ticks, or the point value for a stop in points.

Contract values as of 14 Oct 2026, from CME Group product pages. See tick value for sources. Verify with your broker. Not investment advice.